Excavation Modelling Case Study:
Kubla Cubed Improves Earthworks Estimating for Corona Excavations
For Kubla, the Corona Excavations Ltd. case study shows what happens when earthworks estimating is built around better data, not more spreadsheets. Using Kubla Cubed to model terrain from PDF and CAD drawings, sequence excavation phases, and produce detailed quantity reports, the team was able to tighten up estimating accuracy while cutting down the time spent getting there.
In a sector where margins depend on getting quantities right first time, Corona Excavations Ltd. needed a more efficient way to price increasingly complex civil works. Adopting Kubla Cubed gave their engineers a clearer way to assess cut-and-fill volumes, test different construction phases, and generate dependable outputs for tendering. This case study looks at how the move from manual takeoffs to 3D earthworks modelling improved speed, consistency, and confidence across the estimating process.
Case Study Project Phases
Ready to Model?