Kubla Cubed 2017 - Adjusting to Subgrade \ Formation Level

Most site plans do not have the sub grade level marked. Instead they mark the final finished level (FFL) and a separate plan of surface material thickness. In this tutorial we look at adjusting the FFL levels to the subgrade level using two different techniques: the offset method and the strip method..